TDedicated new construction housing for installation in Non-IC or insulated ceilings, must specify. Air-tight construction provides energy savings by reducing the flow of air through the ceiling.
CONSTRUCTION Plaster Frame: 0.040 steel frame with integral bar hanger brackets. Brackets can accommodate longer 27†accessory flat bar hangers. Brackets run along all sides of frame to allow bar hangers to be run parallel or perpendicular to junction box.
Housing: 0.040 aluminum one-piece can. Housing adjusts for ceiling thickness from 1/2†to 1-1/4â€Â.
Air Flow Restriction: Housing has factory installed gaskets to restrict airflow from room into ceiling plenum to <2CFM (cubic feet per minute) in accordance with ASTM-283 Air-Tight requirements.
Bar Hangers: Two 13-3/4†to 24-1/2†adjustable bar hangers with captive nails are included on frame. Bar hangers are parallel to junction box